PB In Stock

Porterbuilt Fabrication

Current In Stock Inventory

We are a stocking dealer for all Porterbuilt Fabrication parts. Below is a current list of parts we have in stock that are ready to ship. In stock parts typically ship in 1-2 business days.

If you do not see Porterbuilt part listed below, we do NOT have it in stock. Please contact us for an accurate production time which is typically 4-6 weeks.

Filters
Set Descending Direction

3 Items

per page
View as List Grid
  1. Dropmember LS Swap Stainless Headers

    These stainless headers work with the Porterbuilt Dropmember and are required for clearance with the frame and steering components when performing an LS swap in your 1963-87 Chevy truck.

    Learn More
    $329.00

  2. Dropmember LS Swap Longtube Stainless Headers

    These longtube stainless headers work with the Porterbuilt Dropmember and are required for clearance with the frame and steering components when performing an LS swap in your 1963-87 Chevy truck.

    Learn More
    $449.00

  3. Dropmember LT Swap Stainless Headers

    These stainless headers work with the Porterbuilt Dropmember and are required for clearance with the frame and steering components when performing an LT swap in your 1963-87 Chevy truck.

    Learn More
    $329.00

Filters
Set Descending Direction

3 Items

per page
View as List Grid